GO Transit – Lansdowne Metrolinx Bridge Rehabilitation


Project Name:
GO Transit – Landsdowne Metrolinx Bridge Rehabilitation
Location:
Toronto, Ontario
Scope of Project:
6 Precast Ballast Walls (5.6m long x 1.9m high x 1.2m wide) & 6 Distribution Slabs (5.6m long x 5.5m wide)
Install Date:
April, 2016
Owner:
Metrolinx
Engineer:
Amec Foster Wheeler
Contractor:
EllisDon

Project Description:

IECS is quickly becoming an industry leader when it comes to precast solutions / specialty precast items associated with not only stormwater management projects but also any challenges encountered across the civil construction industry. This project was a rehabilitation of the Lansdowne Metrolinx Bridge for GO Transit. IECS manufactured custom Precast Ballast Walls and Distribution Slabs including over 130 – 25mm dowels fitting into conjoining 60mm pockets for the general contractor EllisDon. Due to the high demand of this rail line, an extremely tight schedule was in order and IECS delivered precision work ensuring no delays during installation.

metrolinx

metrolinx

metrolinx

International Erosion Control Systems
IECS Ready Mix Inc.

Headquarters

22295 Hoskins Line
Rodney, Ontario
Canada, N0L 2C0

Phone: 1-800-821-7462

IECS Ready Mix Inc. Phone: 519-785-4327(IECS)
Fax: 1-866-496-1990

Click To See All Locations

Western Canada Headquarters

#300-160 Quarry Park Blvd. SE
Calgary, Alberta
Canada, T2C 3G3

10321 8th Ave E
Humboldt, Saskatchewan
Canada, S0K 2A0

Phone: 1-800-821-7462
Fax: 1-866-496-1990

International Erosion Control Systems